Vertical IP8024 Installation Guide Page 110

  • Download
  • Add to my manuals
  • Print
  • Page
    / 160
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 109
Ferrite Core Installation and Wiring 6-12
Chapter 6: DECT Installation
MBX IP Hardware & Installation Guide
Wiring with connection tab between WTIB4/8 and Base Station
Wiring with MDF and connection tab between WTIB4/8 and Base Station
NOTE: Even though there are connection points such as MDF or connection tab between WTIB4/8 and
Base Station, the connection points should be connected with twisted-pair cable (at least CAT3
class). For example, WTIB4/8 to MDF, MDF to MDF, MDF to connection tab, and connection tab
to Base Station should be connected with twisted-pair cable.
Release 1.7
April 2012
Page view 109
1 2 ... 105 106 107 108 109 110 111 112 113 114 115 ... 159 160

Comments to this Manuals

No comments