Vertical Edge 120 Instruction Manual Page 237

  • Download
  • Add to my manuals
  • Print
  • Page
    / 504
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 236
- 229 -
DX-120 Programming Manual BASIC CALL HANDLING PROGRAMMING TASKS
Establishing SLT Hook Flash via PC-DBA (continued)
1) Go to ProgrammingXCall HandlingXTiming to display the Call Handling—Timing screen.
From the SLT Hook Flash fields in the lower left area of the screen:
2) Select the settings for the fields as described below:
Establishing SLT Hook Flash via PC-DBA (continued on next page)
For this field... Select...
Start
The minimum time that an analog/SLT must flash the hook-switch to be con-
sidered a valid flash-hook request.
A hook-flash that is shorter than this timer is considered a mistake; no
action is taken.
Valid options include from 60 - 1400 milliseconds.
The default is 200 milliseconds.
End
The maximum time that an analog/SLT must flash the hook-switch to be con-
sidered a valid flash-hook request.
A hook-flash that is longer than this timer is considered a hang up.
Valid options include from 100 - 1500 milliseconds.
The default is 1000 milliseconds.
Page view 236
1 2 ... 232 233 234 235 236 237 238 239 240 241 242 ... 503 504

Comments to this Manuals

No comments