Vertical Edge 120 Instruction Manual Page 31

  • Download
  • Add to my manuals
  • Print
  • Page
    / 504
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 30
- 23 -
DX-120 Programming Manual PROGRAMMING VIA PC-DATABASE ADMINISTRATION (PC-DBA)
PERFORMING A WARM START
Use the Warm Start process to cause the system to restart its operations without reloading or affecting the stored
database (e.g., if some how one or more ports lock up, etc.).
CAUTION
USE THIS FEATURE WITH CARE!
This operation requires confirmation since all calls in progress will be
disconnected.
NOTE
Once you run this operation, connection between the switch and PC-DBA will be lost.
Therefore, you will have to re-connect to the switch.
After you connect the PC-DBA to the switch:
From the main PC-DBA Screen:
1) Go to MaintenanceXRemote ControlXSoftware Warm Start to display a prompt warning you about what
will happen if you continue with this process. (i.e., all system process will be discontinued and any calls in
progress will be disconnected).
2) Click Yes to execute the Warm Start.
• At the end of the process a message will appear to confirm that a warm start was successfully
completed.
OR
Click No to cancel the Warm Start and close the warning prompt.
3) Click OK to close the window.
HINT
Also refer to the Vertical DX-120 Installation and Maintenance Manual which can be
found on the Vertical CCC website (www.vertical.com/service-login.html).
Page view 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 503 504

Comments to this Manuals

No comments